Projects and experience

2009/ Present

Sep -2009 to Present

Project Construction of Underground & Aboveground8”Ø Duplex flow line for KB-17 well at KBA

Client & ContractorIn Salah Gas / CTCO
Works DescriptionTrenching, Transportation, Laying, Field Weld & Coating, Lowering, Backfilling, Testing & Commissioning of 8ӯ Duplex flow line from Main header to KB-17 well

2008 / Present

Feb-2008 to Present - Last on June-2010

Project Civil Works for KRECHBA CPF Expansion  - Algeria

Client & Contractor BP, SONATRACH and STATOIL - JV  & PETROFAC / CTCO as a subcontractor
Works DescriptionMaterial Procurement & Construction of Civil works for KRECHBA CPF Expansion works at In SALAH Gas Field

2008 /2009

July-2008 To  Sep-2009

ProjectOLEODUC LZ2, Ø 24” Pipeline - 530 Km GPL from Hassi R'mel to Arzew, Algeria)

Client & ContractorSONATRACH & SAIPEM Contracting ALGERIA / CTCO as a construction subcontractor
Works DescriptionMechanical construction works including Coating of 24"Ø product Pipeline -210 Km from LAGHOUAT to TIARET, Algeria

Dec- 2008 To Present & Last on July 2010

ProjectIN-SALAH GAS - BDV Expansion - Algeria

Client & ContractorBP, SONATRACH and STATOIL - JV & CTCO
Works DescriptionMaterial Procurement & Construction of BDV (Main Camp), Roads, Electrical Works, Sewage & Potable Water Lines & Structural Steel Works.

July 2007 To Present & Last On July 2010

ProjectIN-SALAH GAS - Algeria

Client & ContractorBritish Petroleum, SONATRACH & CTCO
Works DescriptionMaterial Procurement, Fabrication and Construction of Gas Well Heads and Miscellaneous works such as construction of Personnel camps, Offices, Roads and Airport runways.

2006 / 2007

ProjectIN-SALAH GAS - Algeria

Client & ContractorBritish Petroleum, Sonatrach & B&R-C
Works DescriptionMaterial Procurement, Fabrication and Construction of Gas Well Heads and Allied camps.

2006 / 2008

ProjectRAS LAFFAN WOQOD HFO BUNKERING FACILITY

Client & Contractor

QATAR PETROLEUM & Maritime Industrial Services Co. LTD. INC

Works Description

- 02 No of 25000 m3 Product Tanks.

- Export P/L Ø =30’’& 20’’Length = 4.5 km.

- Pumps Station, 03 No. of Loading Arms Installation.

- Loops, Launchers, Receivers along with Export & Import P/L.

2005 / 2006

ProjectWater Transferring BENI HAROUN, W. MILA - Algeria

Client & Contractor

A.N.B , Società italiana per condotte d’acqua s.p.a, & T.G.C.T.P

Works DescriptionWater Transferring Pipeline, Ø 2600 mm, Ø 1600 mm, BENI HAROUN Pumping Station to Barrage OUED ATHMENIA, MILA City, Algeria .


2005 / 2006

ProjectCentre Carburant NAFTAL. AVM D.E.B Alger Air port - Algeria.

Client & ContractorNAFTAL , SECOMOC- BATENCO OUEST.
Works DescriptionPipeline, 16”, 8”, Kerosene Loading Station nozzle sys.

2005 / Present

ProjectPotable Water Distribution Zone Industrial ARZEW – ORAN.

Client & ContractorSONATRACH, BENTINI spa, OGA.
Works DescriptionPipeline, 30”, 20”, 26.8 Km & Pumping Station.

1994 / 2005

ProjectMELUT OIL DEVLOPMENT Segment A2 - Sudan.

Client & ContractorPETRODAR, STROYTRANSGAS int., OUAIS GROUP.
Works DescriptionPipeline 32”, 186 Km and 06 BVS, Receiver Station.

2003 / 2004

ProjectDOG1 BENI MANSOUR- SIDI ARCINE Pipeline Algeria.

Client & ContractorSONATRACH, Brown & Root – Condor, TMCA.
Works DescriptionPipeline 20” 90 Km of 145 Km.

2002 / 2003

Project

OLEODUC OZ2, 34” Pipeline, 418.5 Km – Batch I. ( PC 01 – H.E.H )To (PC05 - LAGHOUAT) – Algeria.

Client & ContractorSONATRACH, BRC, COSIDER, TMCA.
Works DescriptionConstruction 13 of Block Valve Stations, (Launcher & Receiver), 5 Cut Stations & 04 Points Injection.

2002 / 2003

ProjectOLEODUC OZ2, 34” Pipeline, 405 Km – Batch II. (PC05 - LAGHOUAT)To (ARZEW Terminal) Algeria.

Client & ContractorSONATRACH, STROYTRANSGAS, TMCA.
Works DescriptionPipeline 137 Km 34”, 06 BVS & ARZEW Terminal.

2001 / 2002

ProjectCSDGL TABYIEH Gas Plant Syria.

 

Client & Contractor

CONOCO Philips (CSDGL), KVAERNER, MIS & Ouais Group.

Works Description

 

Construction of .

  • 18” 246 km Transport Gas Pipeline.
  • 100 km, flow lines from 8” To 26”.
  • 68 km 10" high pressure flow lines between Gas Plant and wellheads, chemical injection skids.
  • 02 Compressors Stations.
  • Gathering Station at JAFRA, QAHAR
  • LPG Railway Loading stations.

Condensate & fire water storage Tank.

 

 

1999 / 2000

ProjectPALMYRA Gas Project - Syria.
Client & ContractorSPC Syria Petroleum Company, BENTINI Spa.
Works DescriptionAL-NAJEB Gathering Station,12" Pipeline, Well Head, Flow lines, Block Valve Stations, Launcher, Receiver, Tanks pre-fabrication and erection.

1997 / 1998

ProjectZARA POWER PLANT Thermo Cycle System - Syria.
Client & ContractorSyrian Energy Ministry, MITSUBISHI HEAVY INDUSTRIES, LTD.
Works DescriptionBOP piping & Cast Iron Pipelines, Pumps, Skids…, Steel Structural, Tank frame, HVAC Sys., Auxiliary Boiler, Water Treatment unity, Fire Protection sys. & Cooling Water Sys included 72”pipelines.

1997 / 1998

ProjectLABUA Water Irrigation - LEBANON.
Client & ContractorLebanese Irrigation Ministry, CHEBLI & TELLAWE Co.
Works DescriptionPipe lines 68 km 36” to 10” Water Transportation P/L with internal Coat,

1995 / 1996

ProjectZAYZOON POWER PLANT – (Steam Turbine) Syria.
Client & ContractorSyrian Energy Ministry, FIAT AVIO & SOIMI,
Works DescriptionPiping & water treatment unity, fire fighting network, Auxiliary Boiler, Skids, Pumps, other Equipments.

1995 / 1996

ProjectAIN MRISA – AL-ABRASH Project (Crude Oil Pipelines) Syria.
Client & ContractorMAHROUKAT, RIMA Co., CHEBLI & TELLAWE Co.
Works DescriptionConstruction two Pipelines 30” km x 2 - 24”and 30 km 26” (All Activities).

1994 / 1996

ProjectOmar Field Development & Maintenance Syria.
Client & ContractorAFPC Al Furat Petroleum Company, SUBURBAINE International.
Works DescriptionPrefabrication, erection heavy wall piping, well head and flow lines, pipelines, Inlet Manifold, Civil, Mechanical Electrical and Instrumentation pre Commissioning of oil and gas production facilities.

1993 / 1994

ProjectAL RAKA Sugar Factory (Extension & Maintenance) Syria.
Client & ContractorAl Sugar General Company, CHEBLI & TELLAEW Co.
Works DescriptionProcurement and Construction of 240 Ton Stainless Steel Piping, Tanks & Steel Structural, Commissioning.

1992

ProjectIntegrated Gas Project OMAR Gas Plant Syria.
Client & ContractorAFPC Al Furat Petroleum Company, SNC LAVALIN Int., Military House.
Works DescriptionExtension of Omar Gas Plant, Slug-catcher, interface connection with existing facilities (Tie-In, Hot Works and Pre commissioning), 13 BVS, Cut Station, Launcher & Receiver on the Export Gas Pipeline Dia-18” 260 km., from Omar Gas Plant to Teshreen Power Station,