|
ÕÝÍÉ ÌÏíÏÉ 1
|
|
 |
|
|
 |
Quality Assurance / Quality Control
|
 |
|
|
|
|
Quality Assurance / Quality Control
|
One of the main priorities of C T C O is to maintain high quality of the System. We have long, outstanding reputation for the quality of our work, and, in order to stay in the market, our main task is to keep the necessary standards. |
|
|
|
- We already are covering all aspects of the construction QA/QC, such as: |
| * |
Preparation of Inspection and Test Plans (I T P), |
| * |
Development of Procedures and Method Statements, |
| * |
Preparation and qualification of welding procedures, |
| * |
Qualification of welders, |
| * |
All kind of non-destructive testing (N D T) and Non-destructive evaluation (N D E). |
| * |
Radiographic, Ultrasonic, Magnetic particle, Liquid penetrate, positive material identification. |
| * |
Trace ability of materials, Installation and erection works. |
| * |
Non-conformance control. |
| * |
As-built mark-up, |
| * |
Preparation of test packages, Loop folders, Pre-commissioning check forms. |
| * |
Pre-commissioning activities – Hydrostatic, Pneumatic and vacuum testing, cable and loop testing. | |
|
| |
| |
|